| Title | Field sampling and analysis plan and quality assurance project plan; Phase three, Snowmelt runoff and associated sediment McMurdo Station, Antarctica; August, 1997 |
| Author | Antarctic Support Associates, Englewood, CA |
| Source | 20p. . Availability: National Science Foundation, Arlington, VA, United States |
| Publication Date | 1997 |
| Notes | In English. Includes 2 appendices. 9 refs. Ant. Acc. No: 84309. GeoRef Acc. No: 285453 |
| Index Terms | ecology; hydrocarbons; meltwater; pollution; runoff; sediments; snow; snowmelt; surface waters; Antarctica--McMurdo Station; Antarctica; McMurdo Station; mitigation; monitoring; organic compounds; pollutants; report; Ross Island; sampling; surface water; terrestrial environment |
| Abstract | Snowmelt runoff monitoring at McMurdo Station during the 1997-1998 season was conducted. This report presents the surface water sampling plan and the quality assurance project plan. (mte) |
| Publication Type | technical report |
| Record ID | 62003351 |